Mariners' Advisory Committee
for the Bay & River Delaware
www.MacDelRiv.org
   
Posted   02-19-2020 20:50  
By   JSG   [Pilots` Association for the Bay and River DE]
 
Monroe Energy, Trainer Dock Soundings (per Monroe):
Quarterly Soundings were performed at the ship and barge dock on Monday 02/03/20. Below are the changes to the depths based on review of the sounding results.

Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, is 34’00” FW 10.36 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 33’ 00” (10.05 m).

Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , is 29’00” FW. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 28’ 00”.